brian crower stg. 2's & s/r install
I am going to install a set of brian crower stg. 2's and s/r kit. How long does it usually take (with all the proper tools) to replace the springs and retainers? I already have the the cams removed and was just wondering about how long it would take. I am doing this at school and will have 4-5 hrs. to work on it tomorrow. Thanks in advance and I'll post again tomorrow to report in on the install.
__________________
92 se-r header,cai,ur pulleys,exhaust,nology wires,everyday driver
93 se-r project all stock for now
|