So here is a summary of my progress:
Day 1
Started swap at 2PM by 11PM had motor out and on the floor but did not take it from under car.
Day 2
Started at 11AM finished at about 10PM
Removed motor from under car and swapped over everything form the rr de to the ve. Mounted motor, most connectors connected, bolted to chassis at all motor mounts
Day 3
Started at 10AM finished at 9PM (about a 2 hour break in between)
Finished all connections except axles. Rewired injectors and distributor. Car ready to start.
Need a new fuel hose as the fuel feed is not quite long enough to get to the proper connection at the rail. Idle connections are not connected at all... cannot figure out where to wire in 3 of the four wires form the two idle connectors on the ve manifold.