7/12/07
Framing working faster than I had expected....only the mandatory inspeections for floor framing, floor decking, and insulation have slowed them down. Roof is roughed out for the garage and rough plumbing is in for the addition.
It's cramped, but its the best we can do....
Next up, finish framing on both addition and garage, sheathing.
-Jimmy