I'm getting there.
- Power steering pump has been replaced.
- Pretty White clutch cable spacer is in place.
- Throttle and cruise control cables are hooked up (more on that later).
- I'm working on the cold side piping. It's at the welder right now for the initial assembly. Once I get it back I'll figure out where I'm going to put the vacuum line and bov flange.
Here are some pics taken when I was mocking it up:
