4-1-09
Isn't she a beaut
After lining up the sub frame underneath I sprayed the top of the mounts with white paint that way when I lifted it in place it would leave a mark where I needed to drill my hole.
I used a 1" hole saw and then hit the hole with a grinding bit to enlarge to about 1 1/16.
Round tube (2 5/8 long) which gets welded in to help stiffen the bracket.
Grade 8 bolt I had laying around.
Hand tightened so I could tack the round tube in place.
Now for the front mount you will have to build the rail down to it and then drill your hole.
More parts arrived!!!
Purchased the Oil pump, Belts (non ac), G-spec Crank Pulley, oil pick up from castilano200sx (thanks)
Purchased the 3" Doug’s Headers exhaust cutout from MN_SR20 (thanks)