ashtonsnissannx
12-12-2009, 11:18 PM
This was a 6 week long total project all the way from stripping the car completely, sand blasting and prepping the car for paint, painting the car, and putting it all together.
I basicly did the complete engine build, complete wiring harness for both the body of the car and the engine electrical to eliminate everything he wouldnt be using, and helping throughout putting the car all back together and getting it on the road. Not a bad 3 weeks time since getting the car back from paint to on the road with the swap. The complete build and pics can be seen here:
http://www.azht.net/forum/showthread.php?t=112487
Got it all done in time for him to move away back home. He just got out of the military. Both him and the car will be missed but we will keep in touch.
I basicly did the complete engine build, complete wiring harness for both the body of the car and the engine electrical to eliminate everything he wouldnt be using, and helping throughout putting the car all back together and getting it on the road. Not a bad 3 weeks time since getting the car back from paint to on the road with the swap. The complete build and pics can be seen here:
http://www.azht.net/forum/showthread.php?t=112487
Got it all done in time for him to move away back home. He just got out of the military. Both him and the car will be missed but we will keep in touch.